Street Excavation
Anytime there is a need to do excavation in the City right-of-way, a Permit To Excavate In Right-Of-Way Application needs to be filled out prior to the excavation.
ROW Use Permit WITHOUT Excavation
Anytime there is a need to do excavation in the City right-of-way, a Permit To Excavate In Right-Of-Way Application needs to be filled out prior to the excavation.
ROW Use Permit WITHOUT Excavation